Table of Contents
Subscribe to the LONGi Newsletter

Recommended by Belgian local EPC IQ Solar, LONGi's Hi-MO One Pro was selected for Worldtrading Europe's warehouse in Ghent, Belgium. The commercial and industrial energy storage system, featuring a single AC cabinet with 261.24kWh of rated storage capacity, was connected to the grid in October 2026.

The project addresses the FMCG distributor's need to make better use of its existing solar PV electricity generation and manage energy demand within its limited 76 kVA grid connection capacity. By coordinating PV generation, battery charging and discharging, and warehouse electricity consumption, the system helps increase solar self-consumption. The whole project helps smooth demand peaks, reduce grid imports and make better use of the site's existing grid connection while lowering electricity costs.

Read the full story here.

,

Related case studies